Power
|
| INSTALLED CAPACITY |
| SL.No. |
Power Station |
Installed Capacity (MW) |
M P SHARE (MW) |
| 1. |
Amarkantak I (30+20) |
50.0 |
50.0 |
| 2. |
Amarkantak II (2x120) |
240.0 |
240.0 |
| 3. |
Satpura I (5x62.5) |
312.5 |
187.5 |
| 4. |
Satpura II (200+210) |
410.0 |
410.0 |
| 5. |
Satpura III (2x210) |
420.0 |
420.0 |
| 6. |
Sanjay Gandhi, Birsinghpur -I (2x210) |
420.0 |
420.0 |
| 7. |
Sanjay Gandhi Birsinghpur -II (2x210) |
420.0 |
420.0 |
| |
Thermal Power Station |
2272.5 |
2147.5 |
| 1. |
Gandhi Sagar(5x23) |
115.0 |
57.5 |
| 2. |
Pench,Totladoh(2x80) |
160.0 |
107.0 |
| 3. |
Rani Awanti Bai Bargi (2x45) |
90.0 |
90.0 |
| 4. |
Ban Sagar I Tons(3x105) |
315.0 |
315.0 |
| 5. |
Birsinghpur(1x20) |
20.0 |
20.0 |
| 6. |
Rajghat (3x15) |
45.0 |
22.5 |
| 7. |
Ban Sagar II Silpara(2x15) |
30.0 |
30.0 |
| 8. |
Bansagar -III Deolond (3x20) |
60.0 |
60.0 |
| Jawaharsagar & Ranapratapsagar Station of Rajasthan (99MW & 172 MW), 50% of 271MW |
- --- |
135.5 |
| |
Hydro Power Station |
835.0 |
837.5 |
| |
Total |
3107.5 |
2985.0 |
| |
Mini/Micro Hydel |
5.455 |
5.455 |
| |
Grand Total |
3112.955 |
2990.455 |
|
|
| |